80,000
LITRE STORAGE CAPACITY
ALL
LEAKS REPAIRED
460,000
LITRES SAVED IN FIRST MONTH
1
OBJECTIVE
To install an integrated municipal backup, rainwater harvesting and filtration system capable of providing potable water
2
SOLUTION
Water efficiency devices were installed to ensure efficient use of water on site. Thereafter three zincalum water storage tanks were constructed. Pipework was installed for rainwater harvesting. And a 5-stage filtration system was installed in order to ensure potable water quality.
3
RESULTS
Increased water use efficiency, municipal backup and use of alternative sources


Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall

Randridge Mall
“A valuable asset to the shopping centre"
We highly recommend them for similar types of installations to the market.